Public Works Icon

Public Works

Initiatives

% Complete

Results from

F.1 Invest to maintain and provide high quality public assets
Rehab existing sanitary sewer system in order to reduce inflow and infiltration of ground water into the system thereby reducing treatment cost


Q4-23
Reconstruct channel to increase channel volume and lower base flood elevation.


Q4-23
Replace or rehab existing pipe systems.


Q4-23
Rehab or revitalization program for city streets


Q4-23
Achieve compliance with the Lead and Copper Rule Revision


Q4-23
Sustainability Icon

Sustainability

Initiatives

% Complete

Results from

F.1 Invest to maintain and provide high quality public assets
The contract with CWD expires. The City will need to renew and the contract or obtain a new service provider using city procurements methods.


Q4-23

Performance Measures

Actual

Results from

Participation Rate in the Recycling Program


FY23

Status Indicators: Above Target Icon On Target | Caution Icon Caution | Below Plan Icon Below Plan | No Information icon No Information

City of Farmers Branch
13000 William Dodson Parkway
Farmers Branch, TX 75234